Franklin Twp, Richland Co, OHMansfield
250+ MW IT · Owned · Pre construction
Ground up campus on owned land. Proves the full campus stack: pod repetition, on site generation dispatch and campus scale DC distribution.
GN 01 800 V DC
GN 02 Generation coupling
OP 02 Mesh AI
OP 04 MCS platform
RC 01 Metered heat delivery
ArizonaGigawatt Land
250+ MW IT · Owned · Site identified
Ground up campus with solar, storage and gas at the same point of interconnection. The proving ground for generation and storage coupling at full scale.
GN 01 800 V DC
GN 02 Generation coupling
GN 03 Grid aware operation
OP 04 MCS platform
PennsylvaniaFort Cherry District
250+ MW IT · Owned · Site identified
Ground up district development in early diligence. Proves campus master planning and grid aware operation on a constrained interconnection.
GN 01 800 V DC
GN 02 Generation coupling
GN 03 Grid aware operation
OP 02 Mesh AI
Northampton County, PABethlehem
8 MW IT · Owned · Pre construction
Smaller owned build. First full test of the pod as the unit of repetition with heat delivery engineered in from day one.
RC 01 Metered heat delivery
RC 02 High grade return water
OP 01 Edge Gateway
OP 02 Mesh AI
Massena, NYMassena St Lawrence
250+ MW IT · Owned · Site identified
Deliberately the hardest environment in the New York programme. Proves winter operation, grid aware dispatch and the co optimisation stack under real constraint.
GN 02 Generation coupling
GN 03 Grid aware operation
OP 02 Mesh AI
OP 04 MCS platform
Chicago, ILStickney MWRD
45 MW IT · Host · LOI in place
Compute inside one of the largest wastewater treatment plants in the world, heat delivered to process. The reference case for the metered heat interface at scale.
RC 01 Metered heat delivery
RC 02 High grade return water
RC 04 Demand matching and storage
OP 02 Mesh AI
New YorkNYSERDA pilot
45 MW IT · Host · Confirmed interest
Pilot developed with New York State support. Proves the host partner model and live ERE reporting alongside PUE for a public counterpart.
RC 01 Metered heat delivery
RC 02 High grade return water
OP 02 Mesh AI
GN 03 Grid aware operation
JapanUndisclosed
45 MW IT · Host · Confirmed interest
Host partner deployment in Japan, name withheld. Proves the stack in a second regulatory and grid environment.
RC 01 Metered heat delivery
RC 02 High grade return water
OP 02 Mesh AI
Philadelphia, PAGrays Ferry
25 MW IT · Host · LOI in place
Deployment at a district energy site. Proves delivery of recovered heat into a live district network and thermal demand matching.
RC 01 Metered heat delivery
RC 02 High grade return water
RC 04 Demand matching and storage
GN 03 Grid aware operation
New York, NYNewtown Creek
15 MW IT · Host · LOI in place
Compute at a wastewater treatment site in New York City, heat to digesters. Proves the edge and pod stack inside dense urban infrastructure.
RC 01 Metered heat delivery
RC 02 High grade return water
OP 01 Edge Gateway
OP 02 Mesh AI
San Jose, CASan Jose
15 MW IT · Host · Confirmed interest
Host partner site in the Bay Area. Proves unstaffed operation under Edge Gateway close to compute demand.
RC 01 Metered heat delivery
RC 02 High grade return water
OP 01 Edge Gateway
New JerseyPrinceton
4 MW IT · Host · Site identified
Small host deployment feeding a district heating opportunity. Proves the 50 kW to pod transition on one control stack.
RC 01 Metered heat delivery
RC 02 High grade return water
OP 01 Edge Gateway